Central Tender (161/2009) Construction of the Upgrade of Mafraq Wastewater Treatment Plant

Description

Mafraq’s existing wastewater treatment plant (WWTP) utilizes stabilization ponds for wastewater treatment on a 37-hectare (ha) site. The plant began operation in 1988 and has consistently failed to meet Jordanian standards for stream (wadi) discharge.  Equipment is seriously deteriorated, and inflowing sewage exceeds design capacity. USAID supported and funded the construction the wastewater treatment plant to upgrade the plant to a capacity of 6,550 m3 per day through simple, low-tech improvements.

Affiliates:

USAID

Locations:

Mafraq, Jordan

Clients:

Ministry of Water and Irrigation

Contractor:

Veolia Water System

Scope of Work:

Supply pipes, valves, mechanical screens, slide gates/sluice gates, switchgears and electrical panels.